"Aristarkhovsky" is a premium clubhouse in Tagansky district of Moscow. The developer was GC Razvitie, a company founded in 2013, which has more than 800,000 square meters of residential real estate in its portfolio. The architectural concept was developed by Megabudka / Megabudka bureau. The building is located in a quiet alley of Taganka, near historical mansions, churches and chamber Moscow courtyards. Three buildings of variable storey height from 6 to 7 floors are united in a closed community. In total there are 55 residences in the complex. Completion is scheduled for the fourth quarter of 2028.
title
- apartments from
-
- area from
- class
- deluxe
- apartments from
- area from
- storey
- 8
- apartments total / for sale
- 55 / 55
- due date
- Q4 2028
deluxe clubhouse in the center of moscow
Layouts in the Aristarkhovsky house
| 1 Bedroom |
|
from | 20 layouts |
| 2 Bedrooms |
|
from | 25 layouts |
| 3 Bedrooms |
|
from | 10 layouts |
About Aristarkhovsky clubhouse
Download the presentation of the complex Aristarkhovsky
The presentation includes location, architecture, infrastructure, information about apartments and technical equipment of the clubhouse.
Aristarkhovsky on the map
Places nearby
Developer of the Aristarkhovsky clubhouse
GC Razvitie is one of the largest real estate development companies in Voronezh and the region, with a portfolio of over 800,000 m² of residential real estate from economy to business class. Many years of experience, innovative technologies, attention to trends and care for their future residents are the ingredients of the organization's success, which can be measured in figures. Thus, at the end of 2020, over 240,232 m² of residential and commercial real estate were realized, currently 259,440 m² are under construction and 371,000 m² are at the design stage. The developer sells residential neighborhoods with commercial premises on the first floors, underground and surface parking lots, landscaped courtyards without cars, sports and children's playgrounds.
We'll help you get a mortgage on the most favorable terms
Apply for a mortgage and receive a decision from several partner banks at once.
Approve mortgage
Frequent questions
Who is the developer of Aristarkhovsky Residential Complex and what class of real estate is it?
This is a deluxe class clubhouse from the developer GC Development, which was founded in 2013 and now has a portfolio of over 800,000 m². The architectural concept was developed by Megabudka / Megabudka bureau.
How many apartments are in the complex and what is their size?
There are 55 residences in three buildings with variable floor levels from 6 to 7 floors, ranging in size from 41 to 165 square meters.
What is the ceiling height and windows in the apartments?
Ceiling height from 3 to 4.3 meters. Wood-aluminum windows made of oak with panoramic glazing are installed.
What kind of finishing is provided in the apartments?
The apartments are delivered without finishing - residents can realize any design solutions.
What engineering systems are installed in the house?
Centralized ventilation with climate control and CO₂/VOC sensors, intelligent lighting, smart grid, multi-stage water filtration to potable water, backup power and water supply, smart home ecosystem.
Does the complex have parking and storage rooms?
Yes, automated underground parking for 76 cars with washing and charging for electric cars, access by elevator. Storerooms are provided.
What kind of infrastructure is there inside the complex and nearby?
Inside: spa complex, fitness area, cafe, patisserie, shopping arcade, concierge service and cleaning. In the courtyard: landscaped garden, rockery, amphitheater, playground, lounge area. Nearby: schools, kindergartens, supermarkets, Tagansky Park, Usachev-Naidyonov Estate Park, Taganka Theater.
Where is the complex located and what is the transportation accessibility?
Tagansky district, Aristarkhovsky pereulok, 6/5. Taganskaya metro station - 4 minutes on foot, Marxistskaya metro station - 6 minutes. To the Garden Ring - 2 minutes by car, to the TTC - 8 minutes.
When is the complex scheduled for completion?
Completion is scheduled for the fourth quarter of 2028.