Apartment with 1 bedrooms, 35 m², in Tatum, floor 17
About Tatum Complex
Places nearby
Developer of the complex Tatum
A young real estate development company whose philosophy is based on design thinking approach. During the first year the new developer launched three unique projects - Nordic Forst, Republic with historical buildings and Portland on the river bank. Forma's value system is based on design thinking and maximum focus on projects with strong individuality. Each of Forma's projects is created by renowned architects. In the future, the developer plans to launch 2-3 projects per year.
We'll help you get a mortgage on the most favorable terms
Apply for a mortgage and receive a decision from several partner banks at once.
Approve mortgage
Documentation
Frequent questions
Who is the developer of Tatum Residential Complex and what class of real estate is it?
This is a business class residential complex from the developer "Forma" - a company founded in 2021. There are 30 objects in the developer's portfolio: 25 are under construction, 5 have already been completed. The developer's projects are realized in the key territories of Moscow and are characterized by strong architectural individuality.
How many buildings are there in the complex and what is the number of storeys?
The complex consists of five towers of variable storeys from 16 to 35 floors. The total area of buildings in the project will be about 87,500 square meters. In total there are 796 residences in the complex.
What is the ceiling height and windows in the apartments?
Ceiling height in the apartments reaches 3 meters, and in the penthouses - 3.6 meters. Panoramic jumbo windows in aluminum profile are installed, filling the rooms with natural light. There is a central air conditioning system.
What kind of finishing is provided in the apartments?
The apartments are offered in two variants: pre-finished or finished. You can choose a ready base for finishing or create your own space to suit your needs.
What engineering systems are installed in the house?
The house is equipped with high-speed elevators with waiting time less than 80 seconds and cellular signal amplification. Central air conditioning and water treatment system provides comfortable microclimate and water quality. There is a multi-level access control system on the territory by card or via mobile application. Round-the-clock video surveillance is conducted throughout the territory, in elevators and halls.
Does the complex have parking and storage rooms?
Yes, there is an underground parking lot. The parking lot is equipped with a heated ramp, charging stations for electric cars, a bicycle storage area and storage for seasonal items - kellers.
What kind of infrastructure is there inside the complex and nearby?
Cafes, pharmacies, beauty salons and service centers are designed on the first floors of the buildings. There are children's club, co-working, mother and child rooms for residents. Schools #170 and #1514, kindergartens, VkusVill supermarket, Kaluzhsky shopping center and fitness club are within walking distance.
How is the territory around the complex landscaped?
The courtyards are completely closed for cars and landscaped. Quiet green corners with benches, modern recreation grounds, pedestrian alleys and children's play areas have been created here.
Where is the complex located and what is the transportation accessibility?
The complex is located at the address: 27, Obrucheva Street. The nearest metro stations "Kaluzhskaya" and "Vorontsovskaya" are 3-5 minutes away on foot. To the Moscow Ring Road - a few minutes by car, to the Third Transport Ring and the Garden Ring - also a quick exit. Vnukovo Airport is about 30 minutes away.
What parks and green spaces are nearby?
In walking distance from the complex - Vorontsovsky Park, South-West Forest Park, Bittsevsky Forest, Botanical Garden of Moscow State University, Ramenki River Valley, Neskuchny Garden and Vorobyovy Gory.
When is the complex scheduled for completion?
Commissioning of the first stage of the complex is scheduled for the first quarter of 2029. Construction is carried out under a CDA with escrow accounts.